Monorail Project
10-11-2020, 10:16 852 Projects / Transport Infrastructure
Location: Ordu / Turkey
Employer: Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects
ZEON’s Role: Detailed Design and Feasibility Study
Year : 2019
Project Description: Ordu Port – Ordu Universty Monorail line is 9.25 km. Project comprises of 11 stations, total tour time 48 minute, Operation & Maintenance Center and Depot Area.



Employer: Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects
ZEON’s Role: Detailed Design and Feasibility Study
Year : 2019
Project Description: Ordu Port – Ordu Universty Monorail line is 9.25 km. Project comprises of 11 stations, total tour time 48 minute, Operation & Maintenance Center and Depot Area.



Related Projects
Ordu Melet River Extradosed Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Melet River Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Ordu Melet River Cable Stayed Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Donetsk Oblast Monorail Project
Location: Donetsk / Ukraine Employer: Private Business Firms ZEON’s Role: Detailed Design and
10.11.20
Transport Infrastructure
Zaporizhzhia Oblast Monorail Project
Location: Zaporizhzhia / Ukraine Employer: Private Business Firms ZEON’s Role: Detailed Design and
10.11.20
Transport Infrastructure
Spaghetti Flyover at Odukpani Junction
Location: Calabar, Cross River State. Nigeria Employer: Government of Cross River State of Nigeria
10.11.20
Transport Infrastructure
