Transport Infrastructure Projects

Ordu Melet River Cable Stayed Bridge

10-11-2020, 10:07 508 Projects / Transport Infrastructure
Location: Ordu / Turkey
Employer: Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects
ZEON’s Role: Preliminary Design and Feasibility Study 
Year : 2019
Project Description: Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 330 m total length and 220 m the largest span, is designed as cable-stayed with a single pylon of 80 m high. The deck cross-section will be orthotropic steel, while the superstructure of the bridge will be connected to the pylon with 42 tensioned cables.



Related Projects

Ordu Melet River Extradosed Bridge

Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey

10.11.20 Transport Infrastructure
Melet River Bridge

Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey

10.11.20 Transport Infrastructure
Monorail Project

Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey

10.11.20 Transport Infrastructure
Spaghetti Flyover at Odukpani Junction

Location: Calabar, Cross River State. Nigeria Employer: Government of Cross River State of Nigeria

10.11.20 Transport Infrastructure
Osogbo East Bypass Motorway Project

Location: Osogbo , Osun State, NIGERIA Employer: Osun State Government, NIGERIA ZEON’s Role :

10.11.20 Transport Infrastructure
Reconstruction of Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja

Location: Lagos, NIGERIA Employer: Slava Bogu Nigeria Limited ZEON’s Role: Detailed Design and

10.11.20 Transport Infrastructure

ZeOn Engineering © 2023 All Rights Reserved. | Designed by Gürkan GEÇİCİ