Ordu Melet River Cable Stayed Bridge
10-11-2020, 10:07 508 Projects / Transport Infrastructure
Location: Ordu / Turkey
Employer: Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects
ZEON’s Role: Preliminary Design and Feasibility Study
Year : 2019
Project Description: Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 330 m total length and 220 m the largest span, is designed as cable-stayed with a single pylon of 80 m high. The deck cross-section will be orthotropic steel, while the superstructure of the bridge will be connected to the pylon with 42 tensioned cables.



Employer: Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects
ZEON’s Role: Preliminary Design and Feasibility Study
Year : 2019
Project Description: Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 330 m total length and 220 m the largest span, is designed as cable-stayed with a single pylon of 80 m high. The deck cross-section will be orthotropic steel, while the superstructure of the bridge will be connected to the pylon with 42 tensioned cables.



Related Projects
Ordu Melet River Extradosed Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Melet River Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Monorail Project
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Spaghetti Flyover at Odukpani Junction
Location: Calabar, Cross River State. Nigeria Employer: Government of Cross River State of Nigeria
10.11.20
Transport Infrastructure
Osogbo East Bypass Motorway Project
Location: Osogbo , Osun State, NIGERIA Employer: Osun State Government, NIGERIA ZEON’s Role :
10.11.20
Transport Infrastructure
Reconstruction of Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja
Location: Lagos, NIGERIA Employer: Slava Bogu Nigeria Limited ZEON’s Role: Detailed Design and
10.11.20
Transport Infrastructure
