Transport Infrastructure Projects

Crescent Island Bridge

10-11-2020, 10:01 622 Projects / Transport Infrastructure
Location: Lagos / Nigeria
Employer: Private Business Firms
ZEON’s Role: Preparation of the TOP-DOWN Method Statement (MS)
Year : 2018
Project Description: Preparation of concept projects and TOP-DOWN Construction methods of viaducts and intersections with a total length of approximately 15 km, all of which will be built on the water in order to provide access to the seminular like artificial island project of 150 hectares to be built on Lagos Lagoon in Lagos / Nigeria









Related Projects

Ordu Melet River Cable Stayed Bridge

Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey

10.11.20 Transport Infrastructure
Spaghetti Flyover at Odukpani Junction

Location: Calabar, Cross River State. Nigeria Employer: Government of Cross River State of Nigeria

10.11.20 Transport Infrastructure
Ordu Melet River Extradosed Bridge

Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey

10.11.20 Transport Infrastructure
Melet River Bridge

Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey

10.11.20 Transport Infrastructure
Reconstruction of Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja

Location: Lagos, NIGERIA Employer: Slava Bogu Nigeria Limited ZEON’s Role: Detailed Design and

10.11.20 Transport Infrastructure
Eyiste Viaduct

Location: Konya, Turkey Employer : Nurol Construction and Trade Inc. ZEON’s Role: Design Review

10.11.20 Transport Infrastructure

ZeOn Engineering © 2023 All Rights Reserved. | Designed by Gürkan GEÇİCİ