Crescent Island Bridge
10-11-2020, 10:01 622 Projects / Transport Infrastructure
Location: Lagos / Nigeria
Employer: Private Business Firms
ZEON’s Role: Preparation of the TOP-DOWN Method Statement (MS)
Year : 2018
Project Description: Preparation of concept projects and TOP-DOWN Construction methods of viaducts and intersections with a total length of approximately 15 km, all of which will be built on the water in order to provide access to the seminular like artificial island project of 150 hectares to be built on Lagos Lagoon in Lagos / Nigeria



Employer: Private Business Firms
ZEON’s Role: Preparation of the TOP-DOWN Method Statement (MS)
Year : 2018
Project Description: Preparation of concept projects and TOP-DOWN Construction methods of viaducts and intersections with a total length of approximately 15 km, all of which will be built on the water in order to provide access to the seminular like artificial island project of 150 hectares to be built on Lagos Lagoon in Lagos / Nigeria



Related Projects
Ordu Melet River Cable Stayed Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Spaghetti Flyover at Odukpani Junction
Location: Calabar, Cross River State. Nigeria Employer: Government of Cross River State of Nigeria
10.11.20
Transport Infrastructure
Ordu Melet River Extradosed Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Melet River Bridge
Location: Ordu / Turkey Employer: Ordu Metropolitan Muncipality Department of Projects and Survey
10.11.20
Transport Infrastructure
Reconstruction of Obaladejobi's Street/Harold Shodipo's Crescent. GRA. Ikeja
Location: Lagos, NIGERIA Employer: Slava Bogu Nigeria Limited ZEON’s Role: Detailed Design and
10.11.20
Transport Infrastructure
Eyiste Viaduct
Location: Konya, Turkey Employer : Nurol Construction and Trade Inc. ZEON’s Role: Design Review
10.11.20
Transport Infrastructure
