<?xml version="1.0" encoding="utf-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:media="http://search.yahoo.com/mrss/" xmlns:turbo="http://turbo.yandex.ru" version="2.0">
<channel>
<title>Projects - Zeon Engineering</title>
<link>https://zeoneng.com/</link>
<language>en</language>
<description>Projects - Zeon Engineering</description>
<generator>DataLife Engine</generator><item turbo="true">
<title>Reconstruction of Obaladejobi&#039;s Street/Harold Shodipo&#039;s Crescent. GRA. Ikeja</title>
<guid isPermaLink="true">https://zeoneng.com/projects/transport-infrastructure/30-reconstruction-of-obaladejobis-street-harold-shodipos-crescent-gra-ikeja.html</guid>
<link>https://zeoneng.com/projects/transport-infrastructure/30-reconstruction-of-obaladejobis-street-harold-shodipos-crescent-gra-ikeja.html</link>
<category><![CDATA[Transport Infrastructure]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 16:44:33 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year:</b> 2017- 2018<br><b>Project Description:</b> Construction of single carriageway, side drainage, walkways and Other ancillary works; Overall length= 1420m.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year:</b> 2017- 2018<br><b>Project Description:</b> Construction of single carriageway, side drainage, walkways and Other ancillary works; Overall length= 1420m. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year:</b> 2017- 2018<br><b>Project Description:</b> Construction of single carriageway, side drainage, walkways and Other ancillary works; Overall length= 1420m. ]]></content:encoded>
</item><item turbo="true">
<title>Reconstruction / Upgrading of Onikan Stadium</title>
<guid isPermaLink="true">https://zeoneng.com/projects/building-and-architecture/29-reconstruction-upgrading-of-onikan-stadium.html</guid>
<link>https://zeoneng.com/projects/building-and-architecture/29-reconstruction-upgrading-of-onikan-stadium.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 16:42:37 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year : </b>2018- 2020<br><b>Project Description:</b> Stadium design and construction and other ancillary works.<br><b>Project Completion Period:</b> 24 Months.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year : </b>2018- 2020<br><b>Project Description:</b> Stadium design and construction and other ancillary works.<br><b>Project Completion Period:</b> 24 Months. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year : </b>2018- 2020<br><b>Project Description:</b> Stadium design and construction and other ancillary works.<br><b>Project Completion Period:</b> 24 Months. ]]></content:encoded>
</item><item turbo="true">
<title>Construction of Sheraton Nouakchott</title>
<guid isPermaLink="true">https://zeoneng.com/projects/building-and-architecture/28-construction-of-sheraton-nouakchott.html</guid>
<link>https://zeoneng.com/projects/building-and-architecture/28-construction-of-sheraton-nouakchott.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:46:25 +0300</pubDate>
<description><![CDATA[<b>Location: </b>Nouakchott / Mauritania <br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the files to be submitted in the tender<br><b>Year:</b> 2020<br><b>Project Description:</b> Basement level for MEP and service areas, six upper floors housing 167 guest rooms, 33 suites, and a presidential suite, and a podium of two floors. The podium comprises the main entrance lobby in addition to restaurants, fitness facilities, retail shops, meeting rooms, and banquet halls.]]></description>
<turbo:content><![CDATA[ <b>Location: </b>Nouakchott / Mauritania <br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the files to be submitted in the tender<br><b>Year:</b> 2020<br><b>Project Description:</b> Basement level for MEP and service areas, six upper floors housing 167 guest rooms, 33 suites, and a presidential suite, and a podium of two floors. The podium comprises the main entrance lobby in addition to restaurants, fitness facilities, retail shops, meeting rooms, and banquet halls. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location: </b>Nouakchott / Mauritania <br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the files to be submitted in the tender<br><b>Year:</b> 2020<br><b>Project Description:</b> Basement level for MEP and service areas, six upper floors housing 167 guest rooms, 33 suites, and a presidential suite, and a podium of two floors. The podium comprises the main entrance lobby in addition to restaurants, fitness facilities, retail shops, meeting rooms, and banquet halls. ]]></content:encoded>
</item><item turbo="true">
<title>Construction of Anglophone West Africa Regional Office and Trade Centre</title>
<guid isPermaLink="true">https://zeoneng.com/projects/building-and-architecture/27-construction-of-anglophone-west-africa-regional-office-and-trade-centre.html</guid>
<link>https://zeoneng.com/projects/building-and-architecture/27-construction-of-anglophone-west-africa-regional-office-and-trade-centre.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:42:37 +0300</pubDate>
<description><![CDATA[Location: Abuja, Nigeria<br>Employer : KUZU GROUP – ERSA – WAZOBIA SET JV<br>ZEON’s Role: Preparation of the Expression of Interest (EOI)<br>Year : 2020<br>Project Description: The 17575 sqm iconic mixed-use business complex shall provide an integrated one-stop-shop for trade facilitation and information services and trade finance and offer a range of facilities: corporate office space, conference and exhibition centre, innovation and incubation hub, hotel, retail etc.]]></description>
<turbo:content><![CDATA[ Location: Abuja, Nigeria<br>Employer : KUZU GROUP – ERSA – WAZOBIA SET JV<br>ZEON’s Role: Preparation of the Expression of Interest (EOI)<br>Year : 2020<br>Project Description: The 17575 sqm iconic mixed-use business complex shall provide an integrated one-stop-shop for trade facilitation and information services and trade finance and offer a range of facilities: corporate office space, conference and exhibition centre, innovation and incubation hub, hotel, retail etc. ]]></turbo:content>
<content:encoded><![CDATA[ Location: Abuja, Nigeria<br>Employer : KUZU GROUP – ERSA – WAZOBIA SET JV<br>ZEON’s Role: Preparation of the Expression of Interest (EOI)<br>Year : 2020<br>Project Description: The 17575 sqm iconic mixed-use business complex shall provide an integrated one-stop-shop for trade facilitation and information services and trade finance and offer a range of facilities: corporate office space, conference and exhibition centre, innovation and incubation hub, hotel, retail etc. ]]></content:encoded>
</item><item turbo="true">
<title>Construction of 400 rooms 5-star hotel and 60 luxury  suites on BOT or PP, GAMBIA</title>
<guid isPermaLink="true">https://zeoneng.com/projects/building-and-architecture/26-construction-of-400-rooms-5-star-hotel-and-60-luxury-suites-on-bot-or-pp-gambia.html</guid>
<link>https://zeoneng.com/projects/building-and-architecture/26-construction-of-400-rooms-5-star-hotel-and-60-luxury-suites-on-bot-or-pp-gambia.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:36:48 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Bijilo / Gambia<br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the Prequalification Documents (PQ)<br><b>Year :</b> 2020<br><b>Project Description: </b>Construction of 400 rooms 5-star hotel and 60 luxury suites on BOT or PP]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Bijilo / Gambia<br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the Prequalification Documents (PQ)<br><b>Year :</b> 2020<br><b>Project Description: </b>Construction of 400 rooms 5-star hotel and 60 luxury suites on BOT or PP ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Bijilo / Gambia<br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the Prequalification Documents (PQ)<br><b>Year :</b> 2020<br><b>Project Description: </b>Construction of 400 rooms 5-star hotel and 60 luxury suites on BOT or PP ]]></content:encoded>
</item><item turbo="true">
<title>Melet River Bridge</title>
<guid isPermaLink="true">https://zeoneng.com/projects/transport-infrastructure/25-melet-river-bridge.html</guid>
<link>https://zeoneng.com/projects/transport-infrastructure/25-melet-river-bridge.html</link>
<category><![CDATA[Transport Infrastructure]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:33:39 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b>  The Melet River Bridge, consists of a total of 110 mt length, 8 openings, total width of 10 m.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b>  The Melet River Bridge, consists of a total of 110 mt length, 8 openings, total width of 10 m. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b>  The Melet River Bridge, consists of a total of 110 mt length, 8 openings, total width of 10 m. ]]></content:encoded>
</item><item turbo="true">
<title>Monorail Project</title>
<guid isPermaLink="true">https://zeoneng.com/projects/transport-infrastructure/24-monorail-project.html</guid>
<link>https://zeoneng.com/projects/transport-infrastructure/24-monorail-project.html</link>
<category><![CDATA[Transport Infrastructure]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:16:03 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Detailed Design and  Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b>  Ordu Port – Ordu Universty Monorail  line is 9.25 km. Project comprises of 11 stations, total tour time 48 minute, Operation &amp; Maintenance Center and Depot Area.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Detailed Design and  Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b>  Ordu Port – Ordu Universty Monorail  line is 9.25 km. Project comprises of 11 stations, total tour time 48 minute, Operation &amp; Maintenance Center and Depot Area. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Detailed Design and  Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b>  Ordu Port – Ordu Universty Monorail  line is 9.25 km. Project comprises of 11 stations, total tour time 48 minute, Operation &amp; Maintenance Center and Depot Area. ]]></content:encoded>
</item><item turbo="true">
<title>Ordu Melet River Extradosed Bridge</title>
<guid isPermaLink="true">https://zeoneng.com/projects/transport-infrastructure/23-ordu-melet-river-extradosed-bridge.html</guid>
<link>https://zeoneng.com/projects/transport-infrastructure/23-ordu-melet-river-extradosed-bridge.html</link>
<category><![CDATA[Transport Infrastructure]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:12:39 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b> Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 220 m total length and 100 m the largest span with 60m side spans  19m wide pi section deck with 2.5m constant depth is designed as cable-stayed. In addition to internal longitudinal and transverse post-tensioning, 2 x 4sets of 4 extradosedcables are provided above the deck at 7m pylons.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b> Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 220 m total length and 100 m the largest span with 60m side spans  19m wide pi section deck with 2.5m constant depth is designed as cable-stayed. In addition to internal longitudinal and transverse post-tensioning, 2 x 4sets of 4 extradosedcables are provided above the deck at 7m pylons. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study<br><b>Year :</b> 2019<br><b>Project Description:</b> Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 220 m total length and 100 m the largest span with 60m side spans  19m wide pi section deck with 2.5m constant depth is designed as cable-stayed. In addition to internal longitudinal and transverse post-tensioning, 2 x 4sets of 4 extradosedcables are provided above the deck at 7m pylons. ]]></content:encoded>
</item><item turbo="true">
<title>Ordu Melet River Cable Stayed Bridge</title>
<guid isPermaLink="true">https://zeoneng.com/projects/transport-infrastructure/22-ordu-melet-river-cable-stayed-bridge.html</guid>
<link>https://zeoneng.com/projects/transport-infrastructure/22-ordu-melet-river-cable-stayed-bridge.html</link>
<category><![CDATA[Transport Infrastructure]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:07:54 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study <br><b>Year :</b> 2019<br><b>Project Description:</b> Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 330 m total length and 220 m the largest span, is designed as cable-stayed with a single pylon of 80 m high. The deck cross-section will be orthotropic steel, while the superstructure of the bridge will be connected to the pylon with 42 tensioned cables.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study <br><b>Year :</b> 2019<br><b>Project Description:</b> Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 330 m total length and 220 m the largest span, is designed as cable-stayed with a single pylon of 80 m high. The deck cross-section will be orthotropic steel, while the superstructure of the bridge will be connected to the pylon with 42 tensioned cables. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Ordu / Turkey<br><b>Employer:</b> Ordu Metropolitan Muncipality Department of Projects and Survey Directorate of Infrastructure Projects<br><b>ZEON’s Role:</b> Preliminary Design and Feasibility Study <br><b>Year :</b> 2019<br><b>Project Description:</b> Melet Bridge is constructed over Melet River on the Ordu – Giresun State Highway. The Bridge, with 330 m total length and 220 m the largest span, is designed as cable-stayed with a single pylon of 80 m high. The deck cross-section will be orthotropic steel, while the superstructure of the bridge will be connected to the pylon with 42 tensioned cables. ]]></content:encoded>
</item><item turbo="true">
<title>Crescent Island Bridge</title>
<guid isPermaLink="true">https://zeoneng.com/projects/transport-infrastructure/20-crescent-island-bridge.html</guid>
<link>https://zeoneng.com/projects/transport-infrastructure/20-crescent-island-bridge.html</link>
<category><![CDATA[Transport Infrastructure]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:01:07 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Lagos / Nigeria<br><b>Employer:</b> Private Business Firms<br><b>ZEON’s Role: </b>Preparation of the TOP-DOWN Method Statement (MS)<br><b>Year :</b> 2018<br><b>Project Description:</b> Preparation of concept projects and TOP-DOWN Construction methods of viaducts and intersections with a total length of approximately 15 km, all of which will be built on the water in order to provide access to the seminular like artificial island project of 150 hectares to be built on Lagos Lagoon in Lagos / Nigeria<br><br><br><br><br><br><br>]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Lagos / Nigeria<br><b>Employer:</b> Private Business Firms<br><b>ZEON’s Role: </b>Preparation of the TOP-DOWN Method Statement (MS)<br><b>Year :</b> 2018<br><b>Project Description:</b> Preparation of concept projects and TOP-DOWN Construction methods of viaducts and intersections with a total length of approximately 15 km, all of which will be built on the water in order to provide access to the seminular like artificial island project of 150 hectares to be built on Lagos Lagoon in Lagos / Nigeria<br><br><br><br><br><br><br> ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Lagos / Nigeria<br><b>Employer:</b> Private Business Firms<br><b>ZEON’s Role: </b>Preparation of the TOP-DOWN Method Statement (MS)<br><b>Year :</b> 2018<br><b>Project Description:</b> Preparation of concept projects and TOP-DOWN Construction methods of viaducts and intersections with a total length of approximately 15 km, all of which will be built on the water in order to provide access to the seminular like artificial island project of 150 hectares to be built on Lagos Lagoon in Lagos / Nigeria<br><br><br><br><br><br><br> ]]></content:encoded>
</item></channel></rss>