<?xml version="1.0" encoding="utf-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:media="http://search.yahoo.com/mrss/" xmlns:turbo="http://turbo.yandex.ru" version="2.0">
<channel>
<title>Building and Architecture - Zeon Engineering</title>
<link>http://zeoneng.com/</link>
<language>en</language>
<description>Building and Architecture - Zeon Engineering</description>
<generator>DataLife Engine</generator><item turbo="true">
<title>Reconstruction / Upgrading of Onikan Stadium</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/29-reconstruction-upgrading-of-onikan-stadium.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/29-reconstruction-upgrading-of-onikan-stadium.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 16:42:37 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year : </b>2018- 2020<br><b>Project Description:</b> Stadium design and construction and other ancillary works.<br><b>Project Completion Period:</b> 24 Months.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year : </b>2018- 2020<br><b>Project Description:</b> Stadium design and construction and other ancillary works.<br><b>Project Completion Period:</b> 24 Months. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Lagos, NIGERIA<br><b>Employer:</b> Slava Bogu Nigeria Limited<br><b>ZEON’s Role:</b> Detailed Design and Consultancy<br><b>Year : </b>2018- 2020<br><b>Project Description:</b> Stadium design and construction and other ancillary works.<br><b>Project Completion Period:</b> 24 Months. ]]></content:encoded>
</item><item turbo="true">
<title>Construction of Sheraton Nouakchott</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/28-construction-of-sheraton-nouakchott.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/28-construction-of-sheraton-nouakchott.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:46:25 +0300</pubDate>
<description><![CDATA[<b>Location: </b>Nouakchott / Mauritania <br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the files to be submitted in the tender<br><b>Year:</b> 2020<br><b>Project Description:</b> Basement level for MEP and service areas, six upper floors housing 167 guest rooms, 33 suites, and a presidential suite, and a podium of two floors. The podium comprises the main entrance lobby in addition to restaurants, fitness facilities, retail shops, meeting rooms, and banquet halls.]]></description>
<turbo:content><![CDATA[ <b>Location: </b>Nouakchott / Mauritania <br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the files to be submitted in the tender<br><b>Year:</b> 2020<br><b>Project Description:</b> Basement level for MEP and service areas, six upper floors housing 167 guest rooms, 33 suites, and a presidential suite, and a podium of two floors. The podium comprises the main entrance lobby in addition to restaurants, fitness facilities, retail shops, meeting rooms, and banquet halls. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location: </b>Nouakchott / Mauritania <br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the files to be submitted in the tender<br><b>Year:</b> 2020<br><b>Project Description:</b> Basement level for MEP and service areas, six upper floors housing 167 guest rooms, 33 suites, and a presidential suite, and a podium of two floors. The podium comprises the main entrance lobby in addition to restaurants, fitness facilities, retail shops, meeting rooms, and banquet halls. ]]></content:encoded>
</item><item turbo="true">
<title>Construction of Anglophone West Africa Regional Office and Trade Centre</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/27-construction-of-anglophone-west-africa-regional-office-and-trade-centre.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/27-construction-of-anglophone-west-africa-regional-office-and-trade-centre.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:42:37 +0300</pubDate>
<description><![CDATA[Location: Abuja, Nigeria<br>Employer : KUZU GROUP – ERSA – WAZOBIA SET JV<br>ZEON’s Role: Preparation of the Expression of Interest (EOI)<br>Year : 2020<br>Project Description: The 17575 sqm iconic mixed-use business complex shall provide an integrated one-stop-shop for trade facilitation and information services and trade finance and offer a range of facilities: corporate office space, conference and exhibition centre, innovation and incubation hub, hotel, retail etc.]]></description>
<turbo:content><![CDATA[ Location: Abuja, Nigeria<br>Employer : KUZU GROUP – ERSA – WAZOBIA SET JV<br>ZEON’s Role: Preparation of the Expression of Interest (EOI)<br>Year : 2020<br>Project Description: The 17575 sqm iconic mixed-use business complex shall provide an integrated one-stop-shop for trade facilitation and information services and trade finance and offer a range of facilities: corporate office space, conference and exhibition centre, innovation and incubation hub, hotel, retail etc. ]]></turbo:content>
<content:encoded><![CDATA[ Location: Abuja, Nigeria<br>Employer : KUZU GROUP – ERSA – WAZOBIA SET JV<br>ZEON’s Role: Preparation of the Expression of Interest (EOI)<br>Year : 2020<br>Project Description: The 17575 sqm iconic mixed-use business complex shall provide an integrated one-stop-shop for trade facilitation and information services and trade finance and offer a range of facilities: corporate office space, conference and exhibition centre, innovation and incubation hub, hotel, retail etc. ]]></content:encoded>
</item><item turbo="true">
<title>Construction of 400 rooms 5-star hotel and 60 luxury  suites on BOT or PP, GAMBIA</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/26-construction-of-400-rooms-5-star-hotel-and-60-luxury-suites-on-bot-or-pp-gambia.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/26-construction-of-400-rooms-5-star-hotel-and-60-luxury-suites-on-bot-or-pp-gambia.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 10:36:48 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Bijilo / Gambia<br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the Prequalification Documents (PQ)<br><b>Year :</b> 2020<br><b>Project Description: </b>Construction of 400 rooms 5-star hotel and 60 luxury suites on BOT or PP]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Bijilo / Gambia<br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the Prequalification Documents (PQ)<br><b>Year :</b> 2020<br><b>Project Description: </b>Construction of 400 rooms 5-star hotel and 60 luxury suites on BOT or PP ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Bijilo / Gambia<br><b>Employer:</b> Ersa İnşaat Proje Turizm Sanayi ve Ticaret A.Ş.<br><b>ZEON’s Role:</b> Preparation of the Prequalification Documents (PQ)<br><b>Year :</b> 2020<br><b>Project Description: </b>Construction of 400 rooms 5-star hotel and 60 luxury suites on BOT or PP ]]></content:encoded>
</item><item turbo="true">
<title>100k bpd Crude Oil Refinery Dismantling, Relocation&amp; Colocation Project in Port Harcourt, Nigeria.</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/18-100k-bpd-crude-oil-refinery-dismantling-relocationamp-colocation-project-in-port-harcourt-nigeria.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/18-100k-bpd-crude-oil-refinery-dismantling-relocationamp-colocation-project-in-port-harcourt-nigeria.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 09:55:32 +0300</pubDate>
<description><![CDATA[Location: Port Harcourt / Nigeria<br>Employer: MTL International Inc.<br>ZEON’s Role: Frond End Engineering &amp; Design (FEED)<br>Year : 2017 - 2018<br>Project Description: Project Management services pertaining to the ex-BP 100k bpd Crude Oil Refinery Dismantling, Relocation&amp; Colocation Project in Port Harcourt, Nigeria.]]></description>
<turbo:content><![CDATA[ Location: Port Harcourt / Nigeria<br>Employer: MTL International Inc.<br>ZEON’s Role: Frond End Engineering &amp; Design (FEED)<br>Year : 2017 - 2018<br>Project Description: Project Management services pertaining to the ex-BP 100k bpd Crude Oil Refinery Dismantling, Relocation&amp; Colocation Project in Port Harcourt, Nigeria. ]]></turbo:content>
<content:encoded><![CDATA[ Location: Port Harcourt / Nigeria<br>Employer: MTL International Inc.<br>ZEON’s Role: Frond End Engineering &amp; Design (FEED)<br>Year : 2017 - 2018<br>Project Description: Project Management services pertaining to the ex-BP 100k bpd Crude Oil Refinery Dismantling, Relocation&amp; Colocation Project in Port Harcourt, Nigeria. ]]></content:encoded>
</item><item turbo="true">
<title>International University Hospital Project</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/15-international-university-hospital-project.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/15-international-university-hospital-project.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Tue, 10 Nov 2020 09:42:18 +0300</pubDate>
<description><![CDATA[<p><b>Location:</b> Batumi / GEORGIA</p><b>Employer:</b> System Construction Company<br><b>ZEON’s Role: </b>Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2014 - 2015<br><b>Project Description: </b>BAU Hospital’s Total Construction Area is 10.285m2. The Hospital has 56 Beds for Patients, 21 ICU beds, New Born ICU 5 beds. It is fully equipt hospital. There are totally 18 departments available in the policlinics. Building has 70pcs car parks.]]></description>
<turbo:content><![CDATA[ <p><b>Location:</b> Batumi / GEORGIA</p><b>Employer:</b> System Construction Company<br><b>ZEON’s Role: </b>Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2014 - 2015<br><b>Project Description: </b>BAU Hospital’s Total Construction Area is 10.285m2. The Hospital has 56 Beds for Patients, 21 ICU beds, New Born ICU 5 beds. It is fully equipt hospital. There are totally 18 departments available in the policlinics. Building has 70pcs car parks. ]]></turbo:content>
<content:encoded><![CDATA[ <p><b>Location:</b> Batumi / GEORGIA</p><b>Employer:</b> System Construction Company<br><b>ZEON’s Role: </b>Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2014 - 2015<br><b>Project Description: </b>BAU Hospital’s Total Construction Area is 10.285m2. The Hospital has 56 Beds for Patients, 21 ICU beds, New Born ICU 5 beds. It is fully equipt hospital. There are totally 18 departments available in the policlinics. Building has 70pcs car parks. ]]></content:encoded>
</item><item turbo="true">
<title>Porta Batumi Skyscraper Tower Project</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/12-porta-batumi-skyscraper-tower-project.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/12-porta-batumi-skyscraper-tower-project.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Mon, 02 Nov 2020 15:58:50 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Batumi / GEORGIA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role: </b>Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009 - 2014<br><b>Project Description:</b> The project is located at the heart of Batumi, Georgia very close to the seaside. The building is 42Floors+ A roof floor, 3 Basement floor as carpark and technical areas. Total construction area 120.000m2 and contains Residential flats, boutique hotel, – Luxury Shopping Areas, Offices and Dining areas.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Batumi / GEORGIA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role: </b>Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009 - 2014<br><b>Project Description:</b> The project is located at the heart of Batumi, Georgia very close to the seaside. The building is 42Floors+ A roof floor, 3 Basement floor as carpark and technical areas. Total construction area 120.000m2 and contains Residential flats, boutique hotel, – Luxury Shopping Areas, Offices and Dining areas. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Batumi / GEORGIA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role: </b>Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009 - 2014<br><b>Project Description:</b> The project is located at the heart of Batumi, Georgia very close to the seaside. The building is 42Floors+ A roof floor, 3 Basement floor as carpark and technical areas. Total construction area 120.000m2 and contains Residential flats, boutique hotel, – Luxury Shopping Areas, Offices and Dining areas. ]]></content:encoded>
</item><item turbo="true">
<title>SIRT AIRPORT  TOWER AND OPERATIONAL BUILDING</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/11-sirt-airport-tower-and-operational-building.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/11-sirt-airport-tower-and-operational-building.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Mon, 02 Nov 2020 15:54:35 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Sirt / LIBYA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009<br><b>Project Description:</b> The project consists of all civil, mechanical, electrical and infrastructure works. The tower is 36 meters long with an operational triangle shaped building. It has atc systems which includes voice control communication systems, voice recorder system, vhf radios, transmitter systems, receiver systems, monitoring and control systems and vhf direction finder systems.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Sirt / LIBYA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009<br><b>Project Description:</b> The project consists of all civil, mechanical, electrical and infrastructure works. The tower is 36 meters long with an operational triangle shaped building. It has atc systems which includes voice control communication systems, voice recorder system, vhf radios, transmitter systems, receiver systems, monitoring and control systems and vhf direction finder systems. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Sirt / LIBYA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009<br><b>Project Description:</b> The project consists of all civil, mechanical, electrical and infrastructure works. The tower is 36 meters long with an operational triangle shaped building. It has atc systems which includes voice control communication systems, voice recorder system, vhf radios, transmitter systems, receiver systems, monitoring and control systems and vhf direction finder systems. ]]></content:encoded>
</item><item turbo="true">
<title>SIRT AIRPORT VIP BUILDING</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/10-sirt-airport-vip-building.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/10-sirt-airport-vip-building.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Mon, 02 Nov 2020 15:50:36 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Sirt / LIBYA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009<br><b>Project Description:</b> The project involves the extension  of the existing  airport building. It consists of presidential hall, ministerial hall, rest rooms,  administirative offices ,presidential bedroom and office on the first floor and on the second floor  mechanical rooms. Main building is of steel construction and over the main building it has the steel construction canopy. Furniture is also within the scope of works. Construction Area 2.000m2]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Sirt / LIBYA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009<br><b>Project Description:</b> The project involves the extension  of the existing  airport building. It consists of presidential hall, ministerial hall, rest rooms,  administirative offices ,presidential bedroom and office on the first floor and on the second floor  mechanical rooms. Main building is of steel construction and over the main building it has the steel construction canopy. Furniture is also within the scope of works. Construction Area 2.000m2 ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Sirt / LIBYA<br><b>Employer:</b> System Construction Company<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2009<br><b>Project Description:</b> The project involves the extension  of the existing  airport building. It consists of presidential hall, ministerial hall, rest rooms,  administirative offices ,presidential bedroom and office on the first floor and on the second floor  mechanical rooms. Main building is of steel construction and over the main building it has the steel construction canopy. Furniture is also within the scope of works. Construction Area 2.000m2 ]]></content:encoded>
</item><item turbo="true">
<title>Victoria Gardens Shopping and Entertainment Complex</title>
<guid isPermaLink="true">http://zeoneng.com/projects/building-and-architecture/9-victoria-gardens-shopping-and-entertainment-complex.html</guid>
<link>http://zeoneng.com/projects/building-and-architecture/9-victoria-gardens-shopping-and-entertainment-complex.html</link>
<category><![CDATA[Building and Architecture]]></category>
<dc:creator>Gurkan</dc:creator>
<pubDate>Mon, 02 Nov 2020 15:43:29 +0300</pubDate>
<description><![CDATA[<b>Location:</b> Lviv / UKRAINE<br><b>Employer:</b> Fenix Capital<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2008 - 2016<br><b>Project Description:</b> Having a structure area of 105,000 m2 + 45,000 m2 of infrastructure are this project has the status of being the largest shopping mall in Western Ukraine with its bowling saloons, movie theaters, supermarkets, stores, open and covered parking lots, stores, ice skating, electronic casino, restaurant and cafeteria facilities.]]></description>
<turbo:content><![CDATA[ <b>Location:</b> Lviv / UKRAINE<br><b>Employer:</b> Fenix Capital<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2008 - 2016<br><b>Project Description:</b> Having a structure area of 105,000 m2 + 45,000 m2 of infrastructure are this project has the status of being the largest shopping mall in Western Ukraine with its bowling saloons, movie theaters, supermarkets, stores, open and covered parking lots, stores, ice skating, electronic casino, restaurant and cafeteria facilities. ]]></turbo:content>
<content:encoded><![CDATA[ <b>Location:</b> Lviv / UKRAINE<br><b>Employer:</b> Fenix Capital<br><b>ZEON’s Role:</b> Construction Supervision, Budget and Work Schedule Tracking, Commissioning <br><b>Year :</b> 2008 - 2016<br><b>Project Description:</b> Having a structure area of 105,000 m2 + 45,000 m2 of infrastructure are this project has the status of being the largest shopping mall in Western Ukraine with its bowling saloons, movie theaters, supermarkets, stores, open and covered parking lots, stores, ice skating, electronic casino, restaurant and cafeteria facilities. ]]></content:encoded>
</item></channel></rss>